Three stops of Metro Line 1 going into operation

The reporter was told by Shenzhen Metro Group that three stops of Metro Line 1’s project continued will go into operation by the end of September. On the afternoon of July 31, at Baishizhou Stop, the first part to open to the traffic, the supervisors of construction gave the station agents all the keys to the train control room, power supply unit, signal control room and other rooms of conventional equipments. The handover – and – takeover of the three rights, the right of management, the right of use and the right of conduct of the first part, officially marks that the first part of Metro Line 1’s project continued shifts from construction to operation.

The first part to open includes Baishizhou Stop, Gaoxinyuan Stop, and Shenda Stop, three stops and three sections, covering 3.5 km. The initial test of the installation, and the fitment of the first part has been completed, which means the completion of whole works.

It is believed that after the handover of the three rights, managerial force will carry out operational rehearsals, ensuring that the first part of Metro Line 1’s project continued will go into operation safely and timely by the end of September this year.