Huatong Interval of Metro Line 3 perforated

On the morning of July 13, the right line tunnel of Huatong Interval, the way from Huaxin Stop—Tongxinling Stop, of Metro Line 3 built by the Tunnel Group of Chinese Railway was perforated.

Metro Line 3 westward comprises eight stops with eight intervals. The names of the stops in correct order are Yitian Stop, Shixia Stop, Shopping Park Stop, Futian Stop, Childrens’ Palace Stop, Lotus Village Stop, Huaxin Stop, Tongxinling Stop, and Hongling Stop. The Metro Line 3 westward is scheduled to be open to traffic in June, 2011.